Wednesday, April 30, 2014

Wiring

Wiring is going in.

We visited the house last night, and they have started running wires, and making the cut outs in the floors for the heating ducts.

The only thing left that we have to do is pick out the remainder of our lighting. We have chosen the pendant lights over the kitchen island.

















But we have the option of making further changes to any light fixture in the house.  We might make some changes to the big lights, we have 3 chandeliers (I hate that name, it sounds so dated),  Entrance, Dining Room and Going up the staircase.  Some of the standard lights are fine and if I remember correctly, I didn't hate the standard lights enough to warrant changing them, but we'll see.

I am now looking forward to them finishing the wiring and starting drywall!

Friday, April 25, 2014

Windows and Doors!

They are in!!!

Monday, April 21, 2014

Comparison

For comparison

This is the show home and our current pic. The water on the ground is due to the fact we had no windows or a roof at this point, so snow got in and melted.

We were there yesterday and it is dry as a bone now. Thanks goodness.

Saturday, April 19, 2014

Kitchen April 19

Thursday, April 17, 2014

Sheeting for roof

Roof sheeting is done. Or I think that's what it's called.  IT's when they put wood sheets up.

Anyways... that's done.  Which is good so no snow will fall inside my house!

The Bathtub surround is in place in the boys bathroom and the ensuite shower is in.  The bathtub in the ensuite hasn't been installed yet though.

The only other update we saw yesterday was the framing for the pocket door in the powder room.



Monday, April 14, 2014

July Baby!

and June become July...

Possession has been bumped to July 18 from June 20.

That's only 3 months away!!!!








Friday, April 11, 2014

April 11

Inside!

April

April

April

Updates Feb

First pics

Powered by Blogger.