Tuesday, May 13, 2014

Wires, Pipes and Plumbing.

All the vent pipes are going in (the silver ones).  The wiring is mostly done on the main floor. and the PVC for plumbing is going in.

Once that is all finished and inspected, then the drywall can go up.

Last night was interesting in that it was the first time we had to go to the show home to get a key.  Up until now it had been unlocked.  I imagine that it was because there really wasn't anything of value, but once wiring/speakers/plumbing start going in, things get locked up.